Mission Grove Apartments: What Riverside’s Own Environmental and Traffic Studies Actually Show

Riverside Accountability Project illustration introducing Mission Grove housing, traffic and infrastructure records; not a project rendering.

This article examines the transportation assumptions in the studies supporting Riverside’s 2024 Mission Grove Apartments environmental record. The figures are modeled estimates, not measured post-construction traffic. It is not an update on the project’s current construction or entitlement status. The cover is an editorial illustration, not a project rendering.

There is nothing wrong with supporting new housing in Riverside. There is also nothing wrong with opposing a particular development, questioning its density, or demanding that infrastructure keep pace with growth.

What is wrong is reducing a complicated development decision to slogans.

The Mission Grove Apartments project at the former Kmart site is a good example. Public discussion can quickly devolve into competing claims that the old Kmart generated more traffic, that apartments will overwhelm the neighborhood, or that 347 housing units somehow mean only 347 new residents.

Riverside’s own environmental and transportation documents provide a much better basis for the discussion.

And some of what those documents say deserves considerably more attention.

Start With the Actual Project

The Mission Grove Apartments project analyzed in the City’s environmental and transportation documents consists of 347 residential units on approximately 9.92 acres at the former Kmart property.

The project replaces the vacant former retail use with a multifamily residential development consisting of a mixture of studio, one-, two-, and three-bedroom apartments—not simply 347 one-person studio units.

That distinction matters when discussing population.

The project’s own Vehicle Miles Traveled analysis uses 829 residents as its modeled project population, based on 2.39 persons per household.

In other words:

347 households × 2.39 persons per household ≈ 829 residents.

That doesn’t mean exactly 829 people will ultimately live there. It is a modeling assumption, not an occupancy guarantee.

But it does mean that suggesting 347 apartments equates to roughly 347 residents is inconsistent with the population assumption used in the project’s own transportation analysis.

What Does the Project’s Own Traffic Study Predict?

The December 2022 Traffic Operational Analysis prepared by LSA provides unusually useful numbers.

The proposed 347 apartments are estimated to generate:

1,609 gross daily vehicle trips.

The study then applies a 9% internal-trip capture adjustment, reducing the total by 145 trips.

The resulting estimate is:

1,464 net daily vehicle trips.

During the morning peak hour, the study estimates:

141 gross trips → 13 internal trips deducted → 128 net AM peak-hour trips.

Those 128 trips consist of 29 inbound and 99 outbound trips.

During the evening peak:

136 gross trips → 12 internal trips deducted → 124 net PM peak-hour trips.

Those consist of 76 inbound and 48 outbound trips.

These are modeled vehicle trips, not unique cars. A resident leaving in the morning and returning later generates separate vehicle movements. That distinction matters when describing what the traffic study actually predicts.

What About the Old Kmart?

This is where the public discussion needs considerably more precision.

The Traffic Operational Analysis expressly describes the former Kmart as an “existing defunct K-Mart store.”

Yet the project’s trip-generation calculation does not take the 1,609 gross apartment trips and subtract some theoretical number of trips that an operating Kmart might have generated.

Instead, the calculation is:

1,609 gross apartment trips / − 145 internal trips / = 1,464 net apartment trips

That is important.

The study addresses reassignment of existing retail traffic affected by changes to project driveways separately, but the documented 1,464-net-daily-trip calculation is not “apartments minus operating Kmart.”

Consequently, arguments claiming that the apartments actually reduce traffic because an operating Kmart theoretically could have generated more trips require a different analysis and supporting evidence.

The project’s own trip-generation calculation does not establish that conclusion.

Likewise, it would be incorrect to claim that all 1,464 trips represent traffic that would never otherwise exist in the area.

The responsible conclusion is narrower:

The project’s traffic study estimates 1,464 net daily apartment-project trips and does not calculate that figure by deducting an operating-Kmart traffic baseline.

Riverside Already Has Traffic Problems Here

The apartments didn’t create every traffic problem around Mission Grove.

Riverside’s own study makes that clear.

Under existing conditions, the Traffic Operational Analysis identifies three study intersections operating at unsatisfactory Level of Service during at least one peak period:

  • Alessandro Boulevard/Cannon Road
  • Trautwein Road/Alessandro Boulevard
  • Trautwein Road/Mission Grove Parkway

Trautwein/Mission Grove is deficient during both AM and PM peak periods.

Several roadway segments are also already operating at deficient levels.

That is important because blaming the apartment project for congestion that existed before it was built would be inaccurate.

But the opposite argument—that existing congestion somehow makes additional project traffic irrelevant—is equally unsupported.

The Project Adds Traffic to Already-Deficient Infrastructure

Under the study’s Opening Year 2027 analysis, eight roadway segments are forecast to operate at unsatisfactory LOS even without the project.

The apartment development nevertheless adds traffic to all eight.

On seven deficient Alessandro Boulevard segments, the study assigns between approximately 439 and 732 additional daily project trips.

Another 110 project trips are assigned to the deficient Trautwein Road segment between Alessandro Boulevard and Mission Grove Parkway.

Yet the study determines these additions do not constitute a “project-related operational deficiency” under Riverside’s technical criteria.

That terminology deserves explanation.

It does not mean:

The project adds no traffic.

It means the additional traffic doesn’t cross the City’s particular technical threshold for classifying the change as a project-related roadway operational deficiency.

Those are very different propositions.

Mission Grove Parkway: 937 Additional Daily Trips

One result deserves particular attention from Mission Grove residents.

For Mission Grove Parkway between Alessandro Boulevard and Plaza Driveway 2, the study forecasts:

12,345 daily trips without the project

and

13,282 daily trips with the project.

The difference is:

937 additional daily project trips.

That is the largest project-trip assignment among the 13 roadway segments shown in the study’s Opening Year 2027 table.

Our calculation using LSA’s numbers is:

937 ÷ 12,345 ≈ 7.59%

So the project’s own traffic volumes imply approximately a 7.6% increase in modeled daily traffic on that particular Mission Grove Parkway segment.

That 7.6% is a derived calculation from the traffic study’s numbers; it is not a percentage stated by LSA.

And it should not be confused with Riverside’s separate volume-to-capacity significance test.

Another Segment Shows an Even Larger Percentage Increase

On Mission Village Drive between Project Driveway 2/Bayou Lane and Mission Grove Parkway, the study estimates:

2,638 daily trips without the project

versus

2,960 with the project.

That’s 322 additional project trips.

Our calculation:

322 ÷ 2,638 ≈ 12.21%

So modeled daily traffic increases approximately 12.2% on that segment.

There is important context, however.

The roadway remains LOS A under the study’s methodology because its modeled volume remains well below its capacity.

That’s exactly why percentages, LOS, roadway capacity and actual trip counts should all be presented together rather than cherry-picking whichever number best supports a predetermined position.

The Study Says the Project Contributes to Deficient Intersections

The 2027 analysis forecasts three intersections at deficient levels with the project:

Alessandro/Cannon / Trautwein/Alessandro / Trautwein/Mission Grove

These intersections are also forecast to be deficient without the project.

But LSA does not stop there.

The analysis states that the project “would contribute to the forecast deficiency” at these intersections and identifies improvements.

Again, the distinction is straightforward:

The project did not create the underlying deficiency.

The project does add traffic to it.

Both statements can be true simultaneously.

Some Queues Exceed Available Storage

Overall intersection LOS isn’t the only operational concern.

The study’s queuing analysis identifies specific turn movements where modeled 95th-percentile queues exceed available storage.

At Mission Grove Parkway/Plaza Driveway 2, the project adds traffic to northbound-left and eastbound-left movements that are forecast to exceed available turn-pocket storage.

For example, the northbound-left movement has approximately 150 feet of available storage, while the modeled AM queue reaches approximately 165 feet.

LSA recommends operational changes including signal retiming and extending the northbound-left-turn pocket by approximately 15 feet.

This illustrates another important point:

An intersection can have an acceptable overall LOS while still having specific operational problems.

One Deficient Intersection Has No Feasible Fix Identified

Trautwein Road/Mission Grove Parkway deserves particular scrutiny.

The study forecasts this intersection to remain deficient under the analyzed future conditions.

Under Opening Year 2027 with the project, the study reports approximately:

AM: 82.1 seconds delay — LOS F

PM: 73.8 seconds — LOS E

By cumulative 2045 with the project, the modeled conditions deteriorate to approximately:

AM: 94.9 seconds — LOS F

PM: 81.1 seconds — LOS F

The analysis evaluates operational changes but concludes that the intersection would remain deficient and that no further feasible operational improvement was identified.

Again, the project alone isn’t responsible for creating that condition.

But adding housing and additional traffic to an area where the City’s own analysis identifies an intersection with continuing deficiencies and no feasible operational fix should be part of the public policy discussion.

Then There Is VMT

Perhaps the most consequential transportation finding isn’t conventional congestion at all.

It is Vehicle Miles Traveled, or VMT.

The April 2023 VMT Analysis estimates project-generated home-based production VMT per capita at:

24.8 under the 2018 baseline scenario

and

22.9 under the 2045 cumulative scenario.

The applicable Riverside significance thresholds are:

13.9 for 2018

and

13.6 for 2045.

That means the project’s modeled VMT per capita substantially exceeds the applicable thresholds under both scenarios.

The project’s transportation consultant therefore identifies a significant project-generated VMT impact.

Mitigation Doesn’t Eliminate the VMT Impact

The VMT analysis evaluates project design features and transportation-demand/VMT-reduction strategies.

The combined measures are estimated to reduce VMT by approximately 17.7%.

But even after that reduction, project VMT remains above Riverside’s significance threshold.

The analysis therefore concludes that the transportation VMT impact remains significant and unavoidable under CEQA.

That phrase matters.

It does not mean the City was legally prohibited from approving the project. CEQA provides mechanisms through which decision-makers can approve projects despite significant unavoidable impacts when the required findings and procedures are satisfied.

But it certainly doesn’t mean the transportation impact disappeared.

The project’s own environmental analysis says otherwise.

Even the “Existing Traffic” Baseline Requires Context

There is another methodological detail residents should understand.

LSA explains that traffic counts collected during the COVID-19 period might not represent realistic traffic conditions.

The consultant therefore didn’t simply use contemporaneous traffic counts everywhere.

The analysis incorporated historical traffic counts, growth adjustments and comparison studies.

At Trautwein Road/Mission Grove Parkway, for example, 2019 traffic counts were increased by 2% annually to develop adjusted 2022 volumes. Those were compared with actual 2022 counts, and the higher movement volume was used as a conservative value.

For other locations, additional adjustments were made using the reference intersection.

That doesn’t prove the study underestimated traffic. In fact, the methodology was expressly designed in part to avoid understating traffic during an abnormal period.

But it does mean the study’s “existing conditions” baseline is partly a constructed analytical baseline, not simply a snapshot of vehicles observed throughout Mission Grove on one ordinary 2022 day.

That methodological distinction belongs in any serious discussion of the study.

This Is What Evidence-Based Debate Should Look Like

None of these facts independently answers the policy question:

Should Riverside have approved 347 apartments at the former Kmart property?

That’s ultimately a land-use and public-policy judgment.

But Riverside residents should be able to debate that question using the City’s own evidence.

The evidence currently supports several conclusions:

The transportation and VMT studies analyzed a 347-unit residential project.

The project’s own VMT modeling assumes approximately 829 residents, not 347.

The traffic analysis estimates 1,464 net daily project vehicle trips after internal-trip capture.

The study does not calculate those 1,464 trips by subtracting a theoretical operating-Kmart traffic baseline.

The project adds substantial traffic to portions of the surrounding road network.

Some surrounding infrastructure was already deficient before the project’s traffic was added.

The project’s traffic contributes to several forecast-deficient intersections.

Specific project-related queue-storage problems require improvements.

At least one deficient intersection is forecast to remain deficient with no further feasible operational improvement identified.

And the project’s VMT impact remains significant and unavoidable even after the analyzed mitigation measures.

Those facts neither require blind opposition nor justify blind support.

They require something Riverside needs considerably more of:

serious scrutiny of development decisions, infrastructure capacity, assumptions, mitigation and the long-term consequences of growth.

The Larger Accountability Question

Mission Grove is also an example of why residents need access to more than political talking points, developer presentations, neighborhood slogans and social-media posts.

A 600-page environmental appendix contains information that can materially change how a project is understood.

The headline may say housing.

The staff report may say development.

A traffic table may say 1,464 trips.

A VMT analysis may say significant and unavoidable.

A roadway analysis may simultaneously say that an already-deficient road receives hundreds of additional trips but doesn’t meet the City’s technical definition of a project-related operational deficiency.

Those statements aren’t necessarily contradictory.

They answer different questions.

The responsibility of elected officials—and of residents who hold them accountable—is to understand the difference.

That is precisely the kind of evidence-based examination I believe should be part of the Riverside Accountability Project: preserve the original documents, identify the underlying claims, distinguish facts from calculations and conclusions, document exactly where the evidence comes from, and then let residents decide whether City Hall’s decisions withstand scrutiny.

For Mission Grove, Riverside’s own documents give us plenty to examine.

Read the underlying documents

The City’s project-document index lists the Draft EIR, technical appendices, Final EIR and mitigation monitoring program under Mission Grove Apartments, PR-2022-001359.

The traffic and VMT figures discussed here come from Appendix I — Traffic Operational Analysis and VMT, including LSA’s December 2022 Traffic Operational Analysis and April 2023 VMT Analysis. The Draft EIR provides the broader environmental context. Consult the Final EIR and mitigation program on the City index alongside those technical studies.

Follow the Riverside Accountability Project on Facebook, and subscribe to new posts at knelsonvsi.com.

Comments

Leave a Reply

Discover more from How my mind sees the world

Subscribe now to keep reading and get access to the full archive.

Continue reading